Little Squirt Too Timeline
12-Dec-02 GOT PLYWOOD FOR BULKHEADS
15-Dec-02 LOFTED TRANSOM & FORWARD BULKHEAD
16-Dec-02 CUT TRANSOM & FORWARD BULKHEAD
18-Dec-02 Cut Fwd Bulkhead and Transom. Started Lofting Cabin Bulkhead
20-Dec-02 Cut out Cabin Bulkhead
03-March-03 Cleared out basement for lofting Bottum Panels
08-March-03 Took pictures of parts to determine size of cabin and cockpit.
21-March-03 Received sheet of plywood for forward top deck
06-Sept-2003 Cutting stringers
21-Sept-2003 Built stand to support bottum panels and keel.
25-Sept-2003 Installed bottum panels to Keel
05-Oct-2003 Added Bottum Board Joiner
12-Oct-2003 Attached Stringers to bottum panels.
24-DEC-2003 Put stringers and cut notches on forward bulkhead.
03-Jan-04 Installed Transom Gusset
06-FEB-04 Put stringers on top deck
06-FEB-04 Put stringers on transom.
Monday 15 March 2004 - Put up bulkheads and am now 3D
Monday 15 March 2004 - Installed eyebolt in stem for standing rigging.
Monday 15 March 2004 - Installed eyebolt in stem for standing rigging.
08-May-04 Installed Box in front of aft cockpit
17-May-04 Moved parts outside and reasembled with glue.
19-May-04 Started installation of battery compartment.
21-May-04 Started installing side hull panels
24-May-04 Installed front and side panels of cabin
26-May-04 Finished Installing Cabin Panels
26-May-04 Installed Port side hull Panel. Painted interior forward compartment.
27-May-04 Istalled wedge to repair gap in forward hull.
01-Jun-04 Started installing cabin roof.
24-Jun-04 Stated installing seats.
05-July-04 Turned Little Squirt Too Over
06-July-04 Sanded hull and applied Putty.
11-July-04 Set up bunks for trailer.
13-July-04 Started applying cloth
16-July-04 First coat red paint
22-July-04 Second coat Red Paint
04-Aug-04 Cut hole for window in cabin
13-Aug-04 First cruise with Little Squirt Too.
10-Oct-04 Painted first coat of cockpit and interior floor.
Thursday 06-Jan-05 Begain making rudder and leeboards